The heart of
Not every technology can simply be inserted into a hall - sometimes it has to be introduced in stages. When a building has constraints, the best solutions are those that can adapt to those constraints during the installation phase.
Romer solutions
1. First case study
A manufacturer of industrial components implemented a modular furnace assembled on site from prefabricated segments. This avoided costly alterations to the hall, and the furnace remained fully functional and ready for future expansion - without technological compromise.