• Controlling | 7" Color touchpanel |
• Screen | Ultrasonic Sieve |
• Air consumption during painting | 15Nm3/h |
• Air consumption during cleaning | 350Nm3/h |
• Tank powder level sensor | 2 pcs |
• Reserve powder level sensor | 1 pc |
• Injectors cleaning | Automatic, up to 12pcs |
Description | |
• Vacuum pump RP-01 from reserve tank to refill the powder tank | |
• Two operation modes, with recovery or with fresh powder only | |
• Closed fluidized tank | |
• Automatic cleaning program for injectors, guns, and powder tank with strong gusts of compressed air | |
• Set of tank powder sensors | |
• Automatic refilling tank with fresh powder | |
• Fresh powder level sensor | |
• An audible alarm alerts the operator with a low level of paint | |
• Control from the 7-inch color touch panel, in addition, the Center is connected to the booth control by ModBus protocol | |
• Programable valve sucking waste powder directly on the dust collector to keep powder center clean |